Beacon Hill HamWAN install, day1…..
Spent the afternoon helping out with a new HamWAN site installation. About half the day was spent hauling up all the equipment. (Full size Dell rack, batteries for UPS, four dishes and three sector antennas) I spent the rest of the time trying to install the UPS, which was really a bunch of rare parts. What I got done will need to be yanked out and re-done on Friday, since I was working with a bad set of assumptions. (No worries, it will be quicker the second time :-)
Like an idiot I got no pictures of what I did, but did get a bunch of pictures of the outside and the one dish Bart got mounted. (Mostly, it will also need some additional work)